Suppy and Delivery for AGO – Acid Gas Oxidizer Replacement Project

PETRONAS GAS BERHAD - GPS

The supply of valve for Acid Gas Oxidizer project at Petronas Gas Berhad Santong is to meet the compliance with DOE Clean Air Regulation. The provision Tie-In package which was awarded for Shutdown in August 2019 had a very tight and critical schedule in order to meet with client’s delivery requirement for shutdown activities. Our team had worked closely with client and principal from the pre-fabrication stage until the delivery of the valve to client’s yard.

VALVE: GATE VALVE – 42” X 150# RF, A216 GR WCB/SS316+STL, GEAR OPERATED

INCLUSIVE OF: Hydrotest, Painting, NDT Inspection, Third Party Inspection from TUV for FAT Test (at factory)